When your supplier goes under: what you can still get out, and in what order

Tooling you paid for, a deposit already wired, stock half finished. The outcome depends almost entirely on decisions you took before there was a problem.

China → France

Factories close. Some fail, some are bought, some lose a landlord or an environmental permit and stop within weeks. For an importer this is not an exotic risk — it is a normal one, and the companies that come through it are the ones that prepared when nothing was wrong.

The warning signs, in the order they appear

  • Lead times stretch without explanation, then stretch again.
  • Requests to change payment terms — a larger deposit, earlier balance, payment to a different entity.
  • Your usual contact leaves and is replaced by someone vague, then that person leaves too.
  • Quality drifts on components you cannot see from the outside — a cheaper grade, a thinner section.
  • The factory stops inviting you to visit.

Any one of these is ordinary. Three together, over a quarter, is a signal to move — not to confront. A supplier in difficulty who feels accused accelerates rather than explains.

Tooling: the thing that is hardest to recover

You paid for the mould. That does not mean it is yours in a way anyone in China will recognise unless three things are true: the contract states you own it, the mould is physically marked with your name and an asset number, and the factory has signed a document acknowledging it holds your property. Without those, a liquidator treats it as a factory asset and your invoice is just evidence that you are a creditor.

Photograph your tooling on every visit, with the marking visible. It costs nothing and it is the evidence that makes the difference.

What to do in the first week

  1. Stop all payments immediately, including any balance due. Recovering money already sent is far harder than withholding it.
  2. Get someone physically to the site. Remote enquiries produce reassurance; a visit produces facts.
  3. Secure your tooling and any finished goods you have paid for, in writing and if possible physically.
  4. Collect your technical file: drawings, specifications, bill of materials, component sources. Rebuilding this elsewhere is the longest part of a transfer, and it disappears when a company does.

The real protection is having qualified a second supplier before you needed one — not necessarily producing there, but qualified, sampled and reachable. The cost of keeping a second source warm is small against a season lost.